Friday, June 5, 2015

Construction

The phase of new construction is now underway.  I was going to leave the interior end caps in place but there was still a mouse smell - so I pulled the endcaps, cleaned them, and sprayed them with Kilz primer.  Then, I used an enzyme cleaner and doused all of the skin inside the walls.  Smell is all gone now and I've started installing Reflectix insulation.

This was one of the last bits of insulation.  You can see pest damage & tunnels.

Reflectix insulation going in.



Wiring from under the chassis.  Brown wires are for the brakes.  120v black (with plugs) and red wires are for the 2-way holding tank heaters.